{"id":325053,"date":"2026-11-27T07:22:01","date_gmt":"2026-11-27T01:37:01","guid":{"rendered":"https:\/\/insurancekhabar.com\/?p=325053"},"modified":"2026-11-27T07:30:04","modified_gmt":"2026-11-27T01:45:04","slug":"a-total-of-11-percent-of-claims-for-the-bhote-koshi-flood-have-been-settled-insurance-claims-have-crossed-rs-20-33-billion-2","status":"publish","type":"post","link":"https:\/\/english.insurancekhabar.com\/a-total-of-11-percent-of-claims-for-the-bhote-koshi-flood-have-been-settled-insurance-claims-have-crossed-rs-20-33-billion-2\/","title":{"rendered":"A total of 11 percent of claims for the Bhote Koshi flood have been settled, insurance claims have crossed Rs 20.33 billion"},"content":{"rendered":"<p>Kathmandu. The insurance claim amount for damage caused by the severe glacial flood in the Rasuwa Bhotekoshi River on August 10 has exceeded 20.33 billion rupees. The Nepal Insurance Association released the provisional details up to Mangsir 3, stating that the total claim amount has reached 20.3315 billion rupees. <\/p>\n<p>Out of a total of 2,556 claims registered in non-life insurance companies, a total of 10.79 percent, that is, 276 claims, have been settled. 2,241 claims are still pending. So far, a total of 859.8 million has been provided to the insured, including advances and payments. The outstanding claim amount is shown to be 12.208 billion rupees. <\/p>\n<p>Although the government has instructed the insurer to expedite the settlement of claims for those affected by the Bhotekoshi and Trishuli rivers floods, insurers have been delayed in providing compensation due to insufficient documentary evidence from the insured side and the on-site inspection report still pending. Because the structures of the hydroelectric project are complex, and even the foreign reinsurer&#8217;s valuator must participate in the damage assessment, delays in damage assessment have also led to delays in distributing compensation claims. <\/p>\n<p>According to the actuarial association&#8217;s data, the highest number of claims went to property insurance, with about 9.4 billion rupees claimed out of 552 claims. This was followed by engineering with about 3.83 billion rupees, motor with about 3.10 billion, and maritime with about 2.40 billion rupees. <\/p>\n<p>Company-wise, the highest claim amount has been received by Himalayan Everest Insurance. From 224 claims, claims amounting to 67,234,86,706 rupees have been received in this company, of which none have been settled so far. Sanima GIC Insurance, which is in second place, received claims amounting to 3,612,22,03,50 rupees 79 paise out of 245 claims, and 53 claims have been settled. <\/p>\n<p>In third place is Shikhar Insurance, where out of 471 claims, claims amounting to 2 billion 5 crore 5 lakh 12 thousand 992 rupees 43 paise have been registered, and 121 claims have been settled with payments exceeding 37 crore 83 lakh rupees. Similarly, Sallico Insurance has about 1 billion 58 crore 85 lakh rupees from 233 claims, Neko Insurance has about 1 billion 26 crore 32 lakh rupees from 252 claims, and Siddharth Premier Insurance has about 1 billion 26 crore 32 lakh rupees from 268 claims. <\/p>\n<p>Among other companies, claims worth approximately 576 million rupees have been registered in Nepal Insurance, approximately 947.5 million in IGI Prudential, approximately 495.5 million in NLG, approximately 417.8 million in Prabhu, approximately 243.1 million in The Oriental, approximately 27.2 million rupees in National Insurance Company, and approximately 5.335 million rupees in National Insurance. <\/p>\n<p>The most interesting point is that 37 of the claims registered on behalf of the insured in United Ajod Insurance have been withdrawn. After deducting the refunded amount, the total claim amount owed to this company is 839.6 million rupees. This means there are a total of 72 outstanding claims to be paid.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Kathmandu. The insurance claim amount for damage caused by the severe glacial flood in the Rasuwa Bhotekoshi River on August 10 has exceeded 20.33 billion rupees. The Nepal Insurance Association released the provisional details up to Mangsir 3, stating that the total claim amount has reached 20.3315 billion rupees. Out of a total of 2,556 [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":325050,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[45031,45159,45096],"tags":[],"class_list":["post-325053","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-banner-news-en","category-news-en","category-non-lifeinsurance-en"],"acf":[],"_links":{"self":[{"href":"https:\/\/english.insurancekhabar.com\/ikbrapi\/wp\/v2\/posts\/325053","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/english.insurancekhabar.com\/ikbrapi\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/english.insurancekhabar.com\/ikbrapi\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/english.insurancekhabar.com\/ikbrapi\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/english.insurancekhabar.com\/ikbrapi\/wp\/v2\/comments?post=325053"}],"version-history":[{"count":1,"href":"https:\/\/english.insurancekhabar.com\/ikbrapi\/wp\/v2\/posts\/325053\/revisions"}],"predecessor-version":[{"id":325054,"href":"https:\/\/english.insurancekhabar.com\/ikbrapi\/wp\/v2\/posts\/325053\/revisions\/325054"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/english.insurancekhabar.com\/ikbrapi\/wp\/v2\/media\/325050"}],"wp:attachment":[{"href":"https:\/\/english.insurancekhabar.com\/ikbrapi\/wp\/v2\/media?parent=325053"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/english.insurancekhabar.com\/ikbrapi\/wp\/v2\/categories?post=325053"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/english.insurancekhabar.com\/ikbrapi\/wp\/v2\/tags?post=325053"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}